Due to uncertainty around changing COVID regulations and the potential impact of sickness within our teams; NMRN may be required to adjust opening hours or close sites at short notice. Whilst all efforts will be made to avoid this and to contact ticket holders ahead of visits we do ask you to check our Facebook and Twitter accounts for details of closures. We apologise for any inconvenience this may cause and thank you for your understanding. 

Pre-booking is advised, and visitors must wear masks for their safety and the safety of others, unless exempt.

HMS Caroline remains temporarily closed. Find The Latest COVID-19 Updates Here.
 

 

Invitation to Tender - Historic Ships Workshop Tender

Historic Ships Workshop Redevelopment Tender

  1. Redevelopment of the Historic Ships Workshops Invitation to Tender V1.2_SC
    - Statement of Requirements
     
  2. Preliminaries Specification and Schedule of Works:
    - Drawing Register
    - DJA Schedule of Work
    - Preliminaries A Section Specification
    - Proposed Bay 1 Access and Logistics Plans
    - Work Secions Specification
     
  3. PCI:
    Pre-Construction Health and Safety Plan
    Historic Ships Workshops Management Asbestos Survey
     
  4. Architectural Information - SCD:
    - SCH-01 Doors
    - SCH-02 Historic Ships Workshop - Ironmongery Schedule
    - SCH-03 Lighting Schedule
     
  5. Architectural Information - Drawing Register
     
  6. Architectural Information - BD:
    - Proprietary Structures Scope
    - Machine Room Mezzanine and Stair 2 Scope
    - Stair 2 - Stair 3 Scope
    - Wall Partition and Lining Types
    - P3 and P4 Typical Details
    - Window balustrade and Dado
    - Ground Floor Laundry Unit
    - Ceiling Floor Details
    - Typical Door Details - 001
    Typical Door Details - 002
    - Double Door Details
    - Proposed PVC Curtain Details
    - Laminating Cabin
    - Laminating Cabin - 001
     
  7. Architectural Information - EN
     
  8. Architectural Information - EX:
    - Location Plan
    - Site Plan
    - Existing Bay 1 - Floor Plans
    Existing Sections AA_BB & CC
    - Existing Sections DD & EE
    - Existing Section FF
    - Existing M&E Internal Elevations 01
    Existing M&E Internal Elevations 02
    Existing M&E Internal Elevations 03
     
  9. Architectural Information - FD (Proposed bay 1 fire Plans)
     
  10. Architectural Information - SKD (Proposed Bay 1 Access and Logistics Plans)
     
  11. Architectural Information - WD1:
    - Proposed Bay 1 Overview
    - Ground Floor - Zone 1
    - Ground Floor - Zone 2
    - Proposed Bay 1 First Mezzanine - Zone 1
    - Proposed Bay 1 First Mezzanine - Zone 2
    - Proposed Bay 1 - Second Floor Plan
    Proposed Bay 1 - Floor Finishes
    Proposed Bay 1 - Skirting Finishes
    Proposed Bay 1 - Wall Finishes
    Proposed Bay 1 - Ceiling Finishes
    Proposed Bay 1 - ground Floor RCP - Zone 1
    Proposed Bay 1 - Ground Floor RCP - Zone 2
     
  12. Architectural Information - WD2:
    - Bay 1 - First Mezzanine - Zone 1 RCP
    - Bay 1 - First mezzanine Floor - Zone 2 RCP
    - Bay 1 - Second Floor RCP
    - Bay 1 Electrical Plans
    - Long Sections AA BB and CC
    - Proposed Sections DD and EE
    - Proposed Section FF
    - WC Proposed Works
    - WC Proposed Works 2
    - New Kitchenette
     
  13. Structure and Mezzanine:
    - MNP Ships Workshop Structural Requirments Rev A
    - QMH3037
     
  14. Supporting Information - Extract:
    - Extract System - Royal Navy National Museum
    - HM Royal Navy 27691b
     
  15. Supporting Information - Lighting Layouts:
    - NMRN - Lighting Quotation
    - NMRN Historic Ships Workshop - All Floors Lighting Layouts
     
  16. Supporting Information - Lighting Calculations:
    - NMRN Historic Ships Workshop - Lighting Calculations
     
  17. Option 2 Mezzanine - BD:
    - Proprietary Structures Scope
    - Mess Room Mezzanine Floor_Stair 1 Scope
    - Wall Partition and Lining Types
     
  18. Option 2 Mezzanine - SCH:
    - Doors
    - Historic Ships Worshop - 3v Ironmongery Sc
     
  19. Option 2 Mezzanine - WD:
    - Proposed Bay 1 Overview
    - Proposed Bay 1 Ground Floor - Zone 1
    - Proposed Bay 1 First Mezzanine - Zone 1
    Proposed Bay 1 Floor Finishes
    Proposed Bay 1 Skirting Finishes
    - Proposed Bay 1 Wall Finishes
    Proposed Bay 1 Ceiling Finishes
     
  20. Option 2 Mezzanine - WD2:
    - Ground Floor RCP - Zone 1
    - First Mezzanine Zone 1 RCP
    - Electrical Plans
    - Long Sections AA BB and CC
    - Section FF
    - Interior Elevations
    - Mess Room Kitchenette

 

<< Back to Tenders Page

White BG